Kaohsiung Station, Taiwan
In July 2016, the Netherlands-based firm Mecanoo Architecten unveiled plans for a new Kaohsiung Station in Taiwan. It is to be the centrepiece of the vast Kaohsiung Metropolitan Area Underground Railway Project, a transportation hub which includes seven subterranean stations along a 9.75 km railway tunnel.
The 8.5 hectare site includes 13,000 sq. m of sunken station plaza, as well as a 35,000 sq. m 'green canopy' designed to add valuable public space and activate the local community.
Adopting the tradition of lanterns that light the main square in front of temples, where the most important events in Taiwanese villages take place, Kaohsiung Station's central hall is a sunken plaza that unfolds underneath a bright ceiling of oval-shaped lights. The immersive space will create a memorable experience for travellers.
The large curvilinear canopy acts as a 'green connector', unifying bus, bike and train transport, and representing Kaohsiung's mission to become a sustainable city. It protects the open public plaza underneath from Kaohsiung's tropical climate in the same way as large trees.
The green space will become a meeting place, a site for events or markets. Designed as a destination rather than merely an efficient mobility hub, the station's canopy connects a hotel, commercial building, shops, restaurants and other facilities.
The colonial Japanese station building, which will be relocated, is embraced by the canopy and symbolically reconnects the old and new Kaohsiung.
The station is expected to be completed by 2024.
Images and content courtesy of Mecanoo Architecten.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.